Three-roller Mill

categoryJSGX

Through the combination of the running directions of the three rollers, self-friction heat generation to the required surface modification temperature is achieved, without the need for additional heating equipment, and the process flow is relatively simple.

Performance and features

Integrated Function Design, Both Modification & Depolymerization

Adopting a unique modification chamber structure, it innovatively integrates dual core functions of modification and depolymerization. It can complete the entire powder processing process without additional equipment, greatly simplifying the production process and improving processing efficiency.

Wide Adaptability, Covering Multi-Granularity Powders

Suitable for various mineral powders ranging from 325 mesh to nano-scale, it can meet the depolymerization, dispersion and surface modification needs of powders with different fineness, featuring wide application scenarios and strong compatibility.

Multi-Industry Application, Rich Practical Cases

Successfully applied in multiple powder industries such as calcined kaolin, ground calcium carbonate (GCC), nano-zinc oxide, silica fume, and fly ash, it has strong practical verification and adapts to various mineral processing needs.

High Performance Indicators, Both Efficiency & Economy

For the modification of ultra-fine GCC and calcined kaolin (D97=10μm), the activation rate exceeds 98% with a unit energy consumption of <35kW·h/t, which significantly reduces production costs while ensuring processing quality.

Technical Parameters

swipe_leftSwipe left on the table below to view more models
Parameters / Model JSGX 200 300 600 900
Main motor power (kW) 4×3 18.5×3 37×3 75×3
Fan power (kW) 2.2 5.5 22 30
Main shaft speed (rpm) 6000 4500 2700 2000
Output (kg/h) 20~80 500~1500 1000~3000 2500~6000

Note: The production capacity is closely related to the particle size, specific gravity, hardness, moisture and other indicators of the raw materials.
The above parameters are for reference only, please consult our engineers for details.

This equipment was used on site in these projects

No results found.

You might also be interested in them

Some related products & equipment
access_time
1-2 Months Lead Time

With product quality firmly ensured, the time required to complete delivery is 1 to 2 months.

attach_money
Outstanding Cost Performance

Matching the consistent quality of German and Japanese brand products, ours comes at a price that’s only 1/3 of theirs.

engineering
Hassle-Free After-Sales Support

Should you encounter any issues during the production process, there’s no need to worry—we offer 24/7 assistance to address your concerns.

build
On-Site Installation & Training

We provide on-site support for equipment installation and debugging, along with thorough operation training to ensure smooth use.

全局代码(添加在网站的每一页body结束之前)